Contract bioprocessing
We consider projects based on the client's technology and on agreed in-house routes. The first step is to check the input data, the product requirements and how well the process fits the site.
Contract project route
Qualification → pilot → data package → repeat campaign. Routine batches only once the route has been qualified.
What we can take on
An agreed campaign to your protocol or to a route we have developed: fermentation broth, or live, inactivated or dried biomass.
Separation, clarification, filtration and concentration, with an assessment of target-component yield and losses between unit operations.
Concentration and production of a dry form: data on losses, properties and suitability for the next stage.
Development and execution of raw-material hydrolysis for a specific application, with separate verification of the form, composition and assessment method.
How materials and responsibilities are allocated
Raw materials and technology are procured and supplied under one of five models; rights and boundaries are agreed before work begins.
1. Fully client-supplied
The client's strain, technology and raw materials. EnviroCells: incoming inspection, adaptation and execution.
2. Client's strain, EnviroCells procurement
Materials are purchased to agreed specifications; substitutions only under change control.
3. Client's objective, EnviroCells development
R&D, selection of the route and materials; production as a separate stage.
4. Our own technology
Production on our own verified route; licensing is set out in a separate agreement.
5. Joint development → repeat batches
Paid R&D under a framework plan; the allocation of rights and exit terms are agreed in advance.
First step
Suitability and safety check, then an NDA where required and secure data transfer.
From pilot to repeat production
We produce material and data at the selected scale. A pilot answers a specific question and does not replace confirmation of repeatability.
We agree the process version, raw-material requirements, control methods and release criteria. The number of qualification batches is determined by risk, not by a universal rule.
Whether routine batches are possible is assessed for the specific route and the confirmed specification.
Scope of work, the role of each party, rights to the technology and results, quality requirements, batch data and terms for handing over the material.
What determines whether we take on the work
Have your process assessed for contract production
Describe your input data and product requirements, and we will assess how well the process fits the site and propose a first step.